Hokkaido Refinery | Overview
Overview
Beginning of operation | 1973 |
---|---|
Site area | 640,000 tsubo (2,120,000 square meters: equivalent to 42 Escon fields) |
Crude oil processing capacity | 140,000 barrels/day (22,260kL/day) |
Location/Access | |
Contact us by phone |
Idemitsu Kosan Co.,Ltd. Hokkaido Refinery General Affairs Division Telephone number 0144-56-0121 (Monday to Friday 8:00am to 4:30pm) |
History
1973 | Start of operation Crude oil processing capacity 70,000 barrels/day (11,100kL/day) |
---|---|
1974 | Obtained JIS mark display approval |
1984 |
Increased processing capacity 90,000 barrels/day (14,300kL/day) Heavy gas oil hydrocracking unit begins operation |
1986 | Operation of vacuum distillation equipment |
1989 | Received TPM Excellent Business Award |
1993 |
Received the TPM Excellent Workplace Award Special Award Increased processing capacity 130,000 barrels/day (20,600kL/day) Operation of debenzene equipment |
1994 | Heavy oil fluid catalytic cracking unit in operation |
1996 |
Obtained ISO9002 certification Light oil deep desulfurization equipment in operation |
1998 | Obtained ISO14001 certification |
1999 | Increased processing capacity 140,000 barrels/day (22,300kL/day) |
2004 | Cracking gasoline desulfurization equipment begins operation |
Year 2005 | Started shipping sulfur-free gasoline and diesel oil |
2010 | Obtained social and environmental contribution green space evaluation system (SEGES) certification. |
2014 | Increased processing capacity 160,000 barrels/day (25,440kL/day) |
2017 | Processing capacity reduction 150,000 barrels/day (23,850kL/day) |
2021 | Acquired high pressure gas specific certification (commonly known as super certification) operator certification. |
2024 | Processing capacity reduction: 140,000 barrels/day (22,260 kL/day) |