Hokkaido Refinery | Facility Capacity
Main refining equipment
-
As of September 16, 2024
| Atmospheric distillation equipment | 140,000 barrels/day (22,260 kL/day) |
|---|---|
| Vacuum distillation equipment | 24,000 barrels/day (3,800 kL/day) |
| Naphtha hydrodesulfurization equipment | 27,000 barrels/day (4,300 kL/day) |
| Catalytic reformer | 18,000 barrels/day (2,900 kL/day) |
| Debenzene equipment | 14,500 barrels/day (2,300 kL/day) |
| Kerosene hydrodesulfurization equipment | 36,500 barrels/day (5,800 kL/day) |
| Light oil deep hydrodesulfurization equipment | 27,000 barrels/day (4,290 kL/day) |
| Heavy gas oil hydrocracker | 16,500 barrels/day (2,600 kL/day) |
| Heavy oil direct desulfurization equipment | 42,000 barrels/day (6,680 kL/day) |
| Heavy oil fluid catalytic cracking equipment | 33,000 barrels/day (5,250 kL/day) |
| Cracking gasoline desulfurization equipment | 17,600 barrels/day (2,800 kL/day) |
| LPG purification equipment | 734 t/day |
| sulfur recovery equipment | 395 t/day |
Oil storage equipment
| crude oil tank | 13 units |
|---|---|
| fuel tank | 72 units |
| sulfur tank | 2 groups |
| LPG tank | 12 units |
utility equipment
| boiler | 5 units | 425 t/hour |
|---|---|---|
| Generator | 3 units | 76,700kW |
Receiving and shipping equipment
Crude oil reception
| open ocean sea berth | 1 unit | 300,000 DWT |
|---|---|---|
| Inner Port West Pier | 1 unit | 70,000 DWT |
Product receipt and shipment
| inner harbor pier | 7 units | 2,500~6,000DWT |
|---|---|---|
| Lorry shipping equipment | 56 stations | |
Attached equipment
| Chemical fire engines, large chemical aerial water cannon trucks, etc. | 6 units |
|---|